An engineer’s work on major projects and what EB-1A asks about it

A client’s cost savings and adoption of a method across an industry are different achievements. This engineer’s appeal shows why that matters. It also shows how a petitioner can successfully challenge one interpretation in a denial and still lose the appeal.

Authority
AAO
Record
In Re: 35873778
Decision or announcement
2025-01-23
Legal weight
Nonprecedent
Categories
EB-1A
Disposition or posture
Appeal dismissed; nonprecedent
Issues
original contribution, field impact, critical role
First published
2026-11-25
Sources checked
2026-11-25
ContentsAbout 3 min
  1. Following the work beyond the project
  2. An outside contractor’s role inside an organization
  3. What the AAO left open
  4. Authorities and records

Following the work beyond the project

The engineer worked in nondestructive testing, including work on major industrial facilities. Contractors wrote about better operations, lower maintenance costs and a refinery project. The original-contributions criterion under 8 C.F.R. § 204.5(h)(3)(v) asks both what was original and why it was of major significance in the field. Skilled use of an established technique can be enormously valuable. A contractor who witnessed the work can describe that value without knowing whether the engineer developed a technique or whether it changed practice elsewhere.

On appeal the petitioner said other organizations used his techniques and that technical papers cited them. The opinion found no identification of the adopting organizations or the papers. An effective way to evaluate such a claim is to trace one change. What would a qualified engineer have done before this work? Which step changed? Where does another team attribute its method to the petitioner? A procedure revision and the engineer responsible for it may explain more than another general testimonial, especially if a reader can identify what changed between versions.

An outside contractor’s role inside an organization

The director treated employment by the organization as a requirement of the leading-or-critical-role criterion. The AAO agreed with the petitioner that the regulatory text does not expressly impose that condition. An outside contractor still has to show what depended on the role. Evidence that a refinery project was large did not establish its significance to the contractor’s activities as a whole. Evidence of a contractor’s reputation could establish something important about the organization while leaving the individual’s role unresolved.

The petitioner attributed roughly 74 percent of one contractor’s revenue to his clients. Its letter did not confirm the percentage or give total revenue. Another described reduced shutdown time without explaining the reduction. When reviewing figures with a business, identify the numerator, denominator, period, and person with access to the underlying records. If the contractor cannot share complete accounts, a narrower and supportable account of one division’s work may be more informative than an unexplained company-wide estimate.

What the AAO left open

A certification based on examinations and experience also raised a separate question about membership judged on outstanding achievements. After resolving membership, original contributions, and critical role against the petitioner, the AAO did not reach compensation. Even success on that point could not change the outcome. The nonprecedent decision dismissed this appeal. A sound reading distinguishes the requirement the director improperly added, the factual gaps that remained, and the compensation question nobody needed to decide.

Consider whether three letters merely repeat a common compliment or document three separate links in the analysis. A supplier, an operating manager and an independent adopter may know different things about the same technique. Distinguishing their knowledge helps a reader see which steps are corroborated and which conclusions remain untested.

Authorities and records